Thermon PETK-10 Instrukcja Użytkownika Strona 7

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 9
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 6
Step 8
Mount the CKTES/PETK on a at surface, with expansion loop of 150 mm in the cables. Heating Cable/Cold Leads
and joint secured in place using bre xing tape. Application of tape shall allow a small degree of movement at the
joint and cables to cater for potential expansion and contraction of the pipeline. Do not over-tighten.
Step 9
Do not move the assembled CKTES/PETK for minimum 24 hours for complete curing.
Installation Instructions 6
150 mm
150 mm
Form TEP0107U-0512 © Thermon Manufacturing Co. Information subject to change.
Przeglądanie stron 6
1 2 3 4 5 6 7 8 9

Komentarze do niniejszej Instrukcji

Brak uwag