WarmTrace
TM
HSX
Hot Water Temperature Maintenance
INSTALLATION PROCEDURES
Przeglądanie stron 0
1 2 3 4 5 6 ... 11 12

Podsumowanie treści

Strona 1 - WarmTrace

WarmTraceTM HSX™Hot Water Temperature MaintenanceINSTALLATION PROCEDURES

Strona 2

1. Refer to Thermon Installation Procedures, FORM CPD 1014, for general installation procedures, requirements and guidelines.2. Upon receiving heati

Strona 3 - INSTALLATION PROCEDURES

Customer: Contractor: Address: Address: Phone No: Phone No. Project Reference:Record 1: Prior to Installation Cable Type: Heater Length: He

Strona 4

Form CPD1014-1008 THERMON . . . The Heat Tracing Specialists®100 Thermon Dr. • PO Box 609 • San Marcos, TX 78667-0609Phone: 512-396-5801 •

Strona 5

2WarmTraceTM HSXFamiliarize yourself with the entire guide prior to installing any heating cable or components. Throughout this guide, the following

Strona 6

3INSTALLATION PROCEDURESCable Type (Catalog No.) Outer Jacket Color Voltage (Vac)HSX 2105-2 Blue 208HSX 2120-2 Green 208HSX 2140-2 Red 208Typical Heat

Strona 7

4WarmTraceTM HSXPrior to Installing Cable. . .1. Verify Electrical Resistance with a megger. • Refer to Cable Testing Section in this Installation G

Strona 8 - Troubleshooting

5INSTALLATION PROCEDURESAttachment Tape (Value Represents Approximate Linear Pipe Length Allowance Per Roll)Where space is a problem, Thermon approved

Strona 9

6WarmTraceTM HSXMaximum Circuit Length vs. Circuit Breaker SizeMaximum Circuit Lengths. . .To prevent excessive electrical currents at the branch circ

Strona 10 - HSX Cable Testing Report

7INSTALLATION PROCEDURESFinal Inspection and Documentation . . .1. It is recommended that the circuit be temporarily energized so that the volts, amp

Strona 11

TroubleshootingThe following information is intended to assist in maintain-ing and troubleshooting a heat traced hot water system. The primary goal of

Strona 12

9INSTALLATION PROCEDURESMaintenance Check List. . .As part of an annual maintenance program or after any work (repair or alteration) has been performe